Project Description
The Stroup Road Bridge replacement over the Little Creek spans 550 feet long and included improvements to the deck, superstructure, and substructure, as well as expansion from two to three spans. ABNA, as the prime, performed all geotechnical investigations, identified utilities, conducted a hydraulic study, and provided all reconnaissance to inform plans and technical specifications.