Project Description
ABNA conducted Civil Engineering Design services for 12 sites located south of the River Des Peres (RDP) Tunnel. The RDP (CSO) Tunnel (11109) project consists of a nine mile long tunnel, pump station, and consolidation sewers along a corridor from west of Kingshighway Blvd and South of Manchester Ave southward to the Lemay WWTP. ABNA prepared site plans for 12 intake facility/drop safe sites, grading at 2 intake facility sites, and pavement design.