Project Description
The rehabilitation pf approximately 74,800 lineal feet (LF) of sewers, varying in size from 6 inches to 30 inches in diameter using CIPP methods, 660 manholes, and 1,236 service connections (ITI SOW). ABNA’s scope included 8 manhole (MH) adjust to grades, 66 LF of new MH construction, 8 point repairs, and 1 shallow MH.