Project Description
The Historic Eads Bridge, originally built in 1874, and reconfigured in 1993 to convert the rail deck to light rail use, required rehabilitation. ABNA was responsible for the structural integrity inspection of the Upper level West Approach Roadway and the West Approach Tunnel, as well as utility verification and construction services to help ensure worker safety