Project Description
ABNA designed a mounted platform, able to slide up and down the length and height of Bagnell Dam, capable of supporting the weight of a CAT 324. Built in 1929-1931 for $30 million, Bagnell Dam is 2,543′ long and has 8 generators that produce a maximum of 21,500 kilowatts each. Additionally, ABNA supported hydro demolition with various construction services and innovative safety solutions. These efforts were completed ahead of the projected schedule.