Project Description

ABNA installed Airport Fire Alarms and ensured the devices and services were in proper working order and in accordance with Airport and FAA drawings, specifications and codes. ABNA verified the lights to ensure they were located within tolerances and with adequate clearances from edges of concrete panels. ABNA also verified that conduits and junction boxes were installed with adequate clearances below concrete and below grade, and that the grounding system was installed properly. Other services included verifying drilling to expose junction boxes; ensuring lights and circuits were installed and wired properly; and verifying systems’ workability and lighting in accordance with specifications. ABNA also provided cost estimates, field inspections and trouble- shooting.